The part must be on the shelf when the crew needs it.
Learning Track · Module 8: Maintenance · Step 67 of 101
Showing content for Europe. Change the region at the top of the page.
- Drivers for each luminaire model, with the correct programme.
- Nodes and photocells.
- Fuses, breakers, earth leakage devices, contactors.
- SPDs and cable joint kits.
Reorder point = use per week × lead time in weeks + safety stock
Middle East, South Asia: Imported parts can take 8 to 12 weeks. Keep a larger safety stock for them. Use the spares tool.
Sources
- EN 13306 Maintenance terminology
- EN 15341 Maintenance key performance indicators
- ISO 55000 Asset management: overview, principles and terminology
Changes: 30 October 2026: First publication: guides for Europe, the Middle East, South Asia, and the USA; failure library; tender clause library; comparisons; tools; downloads. See the changelog. Found a mistake? Report it.