The part must be on the shelf when the crew needs it.

Learning Track · Module 8: Maintenance · Step 67 of 101

Showing content for Europe. Change the region at the top of the page.

  • Drivers for each luminaire model, with the correct programme.
  • Nodes and photocells.
  • Fuses, breakers, earth leakage devices, contactors.
  • SPDs and cable joint kits.
Reorder point = use per week × lead time in weeks + safety stock

Middle East, South Asia: Imported parts can take 8 to 12 weeks. Keep a larger safety stock for them. Use the spares tool.

Sources

  1. EN 13306 Maintenance terminology
  2. EN 15341 Maintenance key performance indicators
  3. ISO 55000 Asset management: overview, principles and terminology

Changes: 30 October 2026: First publication: guides for Europe, the Middle East, South Asia, and the USA; failure library; tender clause library; comparisons; tools; downloads. See the changelog. Found a mistake? Report it.