The preventive visit to a cabinet or feeder pillar.

Learning Track · Module 10: SOPs · Step 81 of 101

Who: electricianWhen: by the preventive plan
  1. Check the outside: door, lock, base, damage, labels, and access.
  2. Check inside for water, insects, heat damage, and missing covers.
  3. Read the meter and controller display. Compare with the platform.
  4. Test each earth leakage device with its test button. Record the result.
  5. Check the SPD status windows.
  6. With covers in place, take a thermal image of terminals and contactors.
  7. Isolate. Tighten terminals to the maker’s torque. Clean the photocell.
  8. Restore. Switch each circuit on and off from the platform.
  9. Complete the checklist and photos in the job.

Sources

  1. EN 50110-1 Operation of electrical installations
  2. OSHA 29 CFR 1910.147 Control of hazardous energy (lockout/tagout)
  3. CEA (Measures relating to Safety and Electric Supply) Regulations

Changes: 30 October 2026: First publication: guides for Europe, the Middle East, South Asia, and the USA; failure library; tender clause library; comparisons; tools; downloads. See the changelog. Found a mistake? Report it.