After a vehicle hit, a fall, or a report of a shock.
Learning Track · Module 10: SOPs · Step 82 of 101
- Keep people away. Do not touch the pole, door, or cables.
- Set up traffic management and a barrier.
- Isolate the circuit at the source. Follow the safe isolation SOP.
- Test the pole and the area for voltage.
- Make cable ends safe and insulated.
- Remove or secure the pole and luminaire.
- Restore other poles if you can isolate the damaged section.
- Photograph the scene. Record vehicle details or a police reference for cost recovery.
- Raise a follow-up job for the new pole and foundation.
Sources
- EN 50110-1 Operation of electrical installations
- OSHA 29 CFR 1910.147 Control of hazardous energy (lockout/tagout)
- CEA (Measures relating to Safety and Electric Supply) Regulations
Changes: 30 October 2026: First publication: guides for Europe, the Middle East, South Asia, and the USA; failure library; tender clause library; comparisons; tools; downloads. See the changelog. Found a mistake? Report it.